Missouri State Guide โ€” Updated 2026

Missouri Demolition Permit
Requirements

๐Ÿ›๏ธ
Missouri Permits Are Issued Locally
Missouri does not have a statewide demolition permit. Local building departments issue all permits. For asbestos NESHAP notification, contact: MDNR, Air Pollution Control Program, Asbestos Section: 573-751-4817

Permit Structure and Fees

Demolition permits in Missouri are issued by your local city or county building department. Typical residential permit fees range from $75โ€“$250. Contact your local building department for the current application process, required documents, and fees.

Key Missouri Requirements

Missouri DNR handles NESHAP statewide. Kansas City and St. Louis have own building departments. Missouri has no statewide contractor licensing for general contractors.

Asbestos Notification in Missouri

The 10-working-day advance asbestos NESHAP notification for demolitions that disturb regulated asbestos-containing material (RACM) above threshold amounts must be submitted to: MDNR, Air Pollution Control Program, Asbestos Section: 573-751-4817

Standard RACM thresholds: 260 linear feet on pipes, 160 square feet on other components, or 35 cubic feet removed. For any structure built before 1980, schedule a licensed asbestos inspection before applying for your permit. See our full asbestos inspection guide for what this involves and what it costs.

Pre-Demolition Checklist for Missouri Projects

  • Confirm permit requirement with local building department
  • Schedule asbestos inspection for pre-1980 structures
  • Submit NESHAP notification if RACM exceeds thresholds (to: MDNR, Air Pollution Control Program, Asbestos Section: 573-751-4817)
  • Arrange utility disconnections: gas, electric, water, sewer
  • Submit demolition permit application with all required documents
  • Post permit on-site; complete demolition; schedule final inspection

Download our free Pre-Demolition Checklist PDF covering all steps in sequence.

Missouri Demolition FAQs

Who handles asbestos notification in Missouri?+

Asbestos NESHAP notification for Missouri demolition projects goes to: MDNR, Air Pollution Control Program, Asbestos Section: 573-751-4817. The 10-working-day notice is required before demolition when RACM exceeds 260 linear feet on pipes, 160 square feet on other components, or 35 cubic feet of removed material. See our asbestos guide for full details on the notification process.

What does a demolition permit cost in Missouri?+

Demolition permit fees in Missouri typically range from $75โ€“$250 for residential structures. This covers the permit fee only โ€” asbestos inspection ($250โ€“$800), utility disconnection ($200โ€“$1,000), and debris disposal are additional costs. See our complete cost guide for a full breakdown.

Do I need a permit to demolish a shed in Missouri?+

It depends on your local jurisdiction. Many Missouri cities and counties exempt sheds under 120โ€“200 square feet from demolition permit requirements. Larger sheds, and any shed with utility connections, typically require a permit. Contact your local building department to confirm the specific threshold for your area. See our permit trigger guide for the full framework.

Disclaimer: Missouri demolition permit requirements vary by local jurisdiction. Always confirm with your local building department before beginning any demolition work.